July 7, 2026: The White Wolf Groundwater Sustainability Agency (GSA) has released the Public Draft of the 2026 Amended GSP and Periodic Evaluation for the White Wolf Subbasin for review and public comment. Click the links below to view and download the Public Draft 2026 of the Amended GSP and Periodic Evaluation for the White Wolf Subbasin. The GSA will be accepting public comments on the Public Draft Amended GSP and Periodic Evaluation during the 60-day public comment period open from July 7, 2026 through September 5, 2026.

Comments on the Public Draft 2026 Amended GSP and Periodic Evaluation can be submitted by:

  • Email to Angelica Martin at amartin@tejonranch.com, or
  • Mail to White Wolf Subbasin GSP
    c/o: Angelica Martin
    4436 Lebec Road
    Lebec, CA 93243

January 25, 2022: The White Wolf GSA adopted the Final 2022 GSP for the White Wolf Subbasin, following the conclusion of the 60-Day public comment period (September 7, 2021 – November 6, 2021).

October 26, 2023: DWR evaluated the 2022 GSP and determined the GSP is approved. 

Click the links below to view and download the Final 2022 GSP for the White Wolf Subbasin.

ANNUAL REPORTS:

Click the links below to view and download the Annual Reports for the White Wolf Subbasin.